Earned Value Status Workbench
Reconcile entered work-package values into exact cost and schedule indices plus an explicit completion-cost scenario.
Loading tool…
How to use Earned Value Status Workbench
Work-package PV, EV, AC and BAC are summed before ratios are calculated. Choose how remaining budgeted work is projected: at budget, at cumulative CPI, or at CPI times SPI. Zero denominators remain unavailable rather than producing infinity.
- Enter work-package json (id, pv, ev, ac, bac).
- Choose the stated convention and check the units and supported model.
- Calculate, inspect the result, then copy or download it.
Good to know
- Exact-grid inputs are plain decimals with at most six places and magnitude≤1e9. Raw JSON number spelling is checked before conversion; decimal strings can preserve exact grid values. Exact rational intermediates are bounded to 8192 bits. 1–100 distinct work packages, one currency and reporting date. Nonnegative values only; PV and EV must not exceed BAC. Schedule variance is a currency-value comparison, not elapsed time. Progress measurement, baseline approval, accounting validity and future performance are not verified. Completion scenarios are user assumptions, not forecasts or advice.
- Local calculation only; no input persistence or external lookup. Text/JSON is limited to 30000 characters and output to 1000000 characters. Numeric model inputs and precision/work limits are stated on this page. Approximate JSON numbers retain full stored values; exact arithmetic outputs retain decimal or fraction strings. Unsupported states fail explicitly.
- Educational user-assumption arithmetic only. No live prices, laws, tax rules, quotes or financial advice.
Common questions
Does a schedule variance of -20 mean twenty days late?
No. EV minus PV is measured in the same value units as the budget. It does not estimate a calendar delay, which requires the underlying schedule and task relationships.
Is the input uploaded or saved?
No. The tool calculates inside this browser tab and provides a local download; it does not persist your input.
Keep going with related tools
All calculators →Project Critical Path Planner
Calculate earliest and latest task timing, exact total slack and critical connections in a task network.
CalculatorsProfit Margin Calculator
Calculate gross profit and gross margin from revenue and cost, including loss-making sales.
CalculatorsPrice Volume Mix Revenue Bridge
Reconcile a matched product portfolio revenue change into exact price, total-quantity and sales-mix effects.
CalculatorsOEE Production Loss Breakdown
Reconcile planned time, downtime, ideal cycle time and good counts into an exact OEE loss breakdown.